Plant decoration in the mine board ceiling

Plant decoration, the top treatment is very important to a decoration project, usually plant decoration which is more choice is the mine board ceiling, because the ceiling with sound absorption, waterproof, moisturizing, heat insulation, light weight and so on.


Mineral wool board generally refers to mineral wool decorative sound absorption board. To granular cotton as the main raw material to join other additives made of high pressure steam cutting, non-asbestos, fire sound and good performance. Surface generally have irregular holes (commonly known as: caterpillars) or microporous (needle hole) and other, the surface can be painted a variety of color paste (factory products are generally white).


Mineral wool board ceiling operation points:


(1) hanging bar, the main keel installation method and light steel keel gypsum board installation method is the same.


(2) installation side keel: the use of L-shaped keel, and the wall with plastic expansion tube or self-tapping screws, fixed spacing 200MM. Install the front keel front wall application putty leveling, you can avoid the future when the wall putty putty pollution and easy leveling.


(3) the installation of sub keel: the use of T-shaped light steel keel, the direction of a 600mm spacing, the other direction of 1200 mm, the sub-keel hanging through the hanging on the big keel, parallel to the main keel in the direction of the installation of 600MM horizontal Support the keel, the distance is 600MM or 1200MM.


(4) When the keel is installed, strengthen the keel at the periphery of the lamp and tuyere position.


(5) hidden inspection: in the hydropower installation, test the water, after the pressure is completed, the keel should be hidden inspection, qualified before entering the next process.


(6) correction leveling: side keel installation is complete, and then review the level of keel system. First adjust the side keel, according to the elevation of the keel to adjust the corresponding sub keel, if necessary to adjust the corresponding main keel.


(7) installation of mineral wool board: mineral wool board with 600 * 1200mm, 600 * 600mm, 300 * 600mm and other mineral wool board, the installation of workers to wear white gloves to prevent pollution.